Ausgrid + Endeavour + Meter exchanged same day
More power? Three phase.
Single phase to three phase upgrades for homes and commercial sites across Sydney. New service, new switchboard, meter exchanged the same day, and every network approval handled by us.

Do you need three phase?
Single phase runs most homes fine, until the big loads start arriving. Three phase brings three supply lines into the property instead of one, so everything runs without working the supply at its limit.
The usual reasons to upgrade:
- An EV charger, or a second one on the way
- Ducted air conditioning
- A pool or spa heat pump
- A large solar and battery system
- Workshop machinery that needs 415V
- A commercial site that has outgrown its single phase supply
How your upgrade runs
01
Upload photos and your details through the contact page. We assess, inspect on site for free if needed, and give you a fixed quote.
02
We lodge the application with Ausgrid or Endeavour Energy. Every network approval is handled by us.
03
We upgrade the service and install the new three phase switchboard. Most house upgrades are done in a day.
04
We exchange the meter the same day on behalf of your retailer, then test, label and energise.
Commercial changeovers run as a planned shutdown executed in a day. On the bigger, more involved supplies we keep the site live on a backup generator while the work happens.
What's in the upgrade
Everything from the network point of supply to the last circuit, done by one contractor:
- New three phase service, overhead or underground
- Consumer mains upgraded where they are undersized
- New switchboard with RCBO protection on every circuit
- Spare space provision for future electrical installations. The EV charger or ducted air can land later without touching the board again
- Surge protection as an option, if you want it
- Meter exchanged the same day on behalf of your retailer
- Tested, labelled and certified with a CCEW

Homes and commercial sites
Most upgrades are houses adding their first big load. Three phase is also the backbone of commercial work: machinery, kitchens, fitouts and sites where single phase stopped being enough a long time ago.
On the commercial side we build supplies from 100A to 200A and greater, with CT metering provisions where the supply calls for it, and the underground or overhead service to match.
Send photos, get a fixed quote
Open the meter box door, photograph the inside, and upload the photos with your property details through the contact page. We complete a desktop assessment, add a free site inspection if it is needed, and come back with a fixed quote, not an estimate that creeps.
Common questions
How much does it cost to upgrade from single phase to three phase power?
Every upgrade is different. Overhead or underground service, the size of the new switchboard and whether the consumer mains need replacing all move the price. We complete a desktop assessment from your photos and details, do a free site inspection if it is needed, and give you a fixed quote. Send it all through the contact page.
Do I need three phase power for my house?
If you are adding an EV charger, ducted air conditioning, a pool, a large solar system or workshop machinery, three phase gives you the capacity to run it all without working the supply at its limit. Plenty of houses never need it. Tell us what you are planning and we will give you a straight answer.
How do I know if my house has single phase or three phase power?
Look at your main switch in the meter box: a single pole switch means single phase, three linked poles means three phase. Your electricity bill or meter can also tell you. If you are not sure, open the meter box door, photograph the inside and send it through the contact page. We will confirm it.
Do I need three phase power for an EV charger?
No. A 7kW single phase charger fully recharges most EVs overnight. Three phase gets you faster charging and makes sense if you have two EVs or other big loads coming. We install both and can upgrade your supply if you want the faster option, so tell us about your car and your plans.
How long does a three phase upgrade take, and will my power be off?
A residential upgrade including the new switchboard is typically completed in a day, and we complete the meter exchange the same day on behalf of your retailer, so there is no waiting on the network. Commercial upgrades run as a planned one day shutdown, and larger supplies can be kept live on a generator. Your quote confirms the plan for your site.
What's involved in a three phase power upgrade?
We lodge the network application, upgrade the service from the street, install a new three phase switchboard with RCBO protection and spare space provision for future circuits, and exchange the meter the same day on behalf of your retailer. Surge protection is available as an option if you want it. Send your details and photos through the contact page and we will quote it.