Skip to content
Thorntek Electrical, Level 2 ASP
Ausgrid & Endeavour accredited

House boards + Commercial boards + Level 2 ASP

Switchboard upgrades.

New compliant switchboards for homes and commercial sites across Sydney, with a fixed quote from your photos and supply restored the same day.

Thorntek electrician completing a new residential switchboard and smart meter installation on a brick home

Signs your switchboard needs upgrading

  • Ceramic rewireable fuses or plug in fuse wedges
  • No safety switches on power or lighting circuits
  • Breakers that trip under normal load
  • A warm board face, a buzz, or a burnt smell near the meter
  • No room for another circuit
  • A defect notice from Ausgrid or Endeavour Energy

If two or more apply, send us photos for advice. For a board named on a notice, see defect rectification.

How the upgrade runs

01

Photograph the inside of the meter box with the door open. Upload it through the contact page or the switchboard audit.

02

We assess from your photos, with a free site visit where needed, and send a fixed quote.

03

On the day: new enclosure, RCBO protection on every circuit, undersized consumer mains upgraded, and a full test before supply is restored.

04

We issue the Certificate of Compliance (CCEW) and lodge every network notification.

Do not open the internal panel. The open door photo is all we need to price the job.

What the upgrade includes

  • A new compliant enclosure
  • RCBO protection (safety switch and circuit breaker in one) on every circuit
  • Undersized consumer mains upgraded
  • Service side work and every Ausgrid or Endeavour Energy approval
  • Meter exchanged the same day on behalf of your retailer, where required
  • Licensed removal of asbestos cement backing, where present
  • A full test before the supply is restored
Thorntek electrician wiring the rear of a new meter panel during a switchboard upgrade

How long it takes

Residential upgrades are completed in a day. Supply is off for part of the day and restored before we leave. Commercial changeovers are a planned shutdown completed in a day, with larger supplies kept live on temporary generation.

Fixed quote from photos

Photograph the inside of the meter box with the door open. Do not open the internal panel. Upload the photo through the contact page or the free switchboard audit and you receive a fixed quote.

Electrician working inside an open residential meter box during a switchboard upgrade

Common questions

How much does a switchboard upgrade cost in Sydney?

Price depends on the board size, the number of circuits and whether the consumer mains need upgrading. You receive a fixed quote from photos of the inside of your meter box, and the figure on the quote is the figure on the invoice.

How do I know if my switchboard needs upgrading?

Ceramic fuses, no safety switches, tripping circuits, flickering lights or a letter naming the board. Send a photo of the inside of the meter box, door open, through our contact page and we will advise.

Are old ceramic fuse boxes dangerous?

Older fuse boards have none of the RCD (safety switch) protection current standards require, and aged fuses and wiring present a shock and fire risk. Send a photo of the inside of your meter box through the contact page for an assessment.

How long does a switchboard upgrade take?

Most residential upgrades, single phase or 3 phase, are completed in a day with supply restored before we leave. Commercial changeovers are a planned one day shutdown around your operating hours, with larger supplies kept live on a backup generator.

Do I need to upgrade my switchboard for solar panels?

Often, yes: the inverter needs its own protection, and many older boards have no room or no longer comply. We upgrade the board and handle the metering, so send photos of the inside of your meter box before the solar is installed.

Do I need a Level 2 electrician for a switchboard upgrade in NSW?

A licensed electrician can replace the board, but work on the consumer mains, service or metering is Level 2 ASP work. Thorntek holds ASP 4869 with both Ausgrid and Endeavour Energy, so one contractor completes the whole job.

Request a quote for your switchboard upgrade.

1300 58 58 16 Get a quote