Skip to content
Thorntek Electrical, Level 2 ASP
Ausgrid & Endeavour accredited

Metering accredited + Same day as the works

Meter exchanges and upgrades.

Meter exchanges and upgrades on behalf of retailers, completed the same day as the works, with the retailer coordination managed by us.

Thorntek electrician terminating cables beneath an electricity meter enclosure

Who exchanges the meter

The network does not attend meter exchanges. They are carried out by an ASP accredited for metering, on behalf of your electricity retailer, and Thorntek holds that accreditation with both Ausgrid and Endeavour Energy.

When a 3 phase upgrade or switchboard upgrade needs a new meter, we exchange it the same day as the works.

How the meter exchange runs

01

Your job is quoted and booked, with the meter exchange included.

02

We coordinate the exchange with your electricity retailer.

03

The meter is exchanged the same day as the works and the job is closed out.

One crew and one visit. Retailer coordination is managed by us.

CT metering provisions for commercial sites

Larger commercial supplies are metered through current transformers (CTs). We install main switchboards with CT metering provisions sized for the supply, as part of the same Level 2 scope.

Metering board for multiple units installed and labelled by Thorntek

Common questions

How much does it cost to install or upgrade an electricity meter?

It depends on the meter and the reason for the change; a single phase exchange differs from a 200A commercial board with CT metering provisions. Meter work is usually priced into one fixed quote for the larger job, so send your details through the contact page.

How do I get a new or smart meter installed, and who pays?

Meter exchanges are arranged through your electricity retailer. When the meter is part of an electrical job such as a 3 phase upgrade, solar or a new switchboard, we exchange it the same day on behalf of your retailer, priced into your fixed quote.

Who can install or replace an electricity meter in NSW?

Only accredited installers, as meters sit on the service side of your connection. Thorntek is accredited to exchange and upgrade meters on behalf of retailers and holds Level 2 ASP 4869 for metering on both the Ausgrid and Endeavour Energy networks.

How long does an electricity meter exchange take?

The exchange is brief and your supply is off only for a short time. As part of a larger job such as a 3 phase upgrade, it is completed the same day, not on a separate visit.

What is CT metering and when is it required?

CT (current transformer) metering measures large supplies through transformers instead of running the full current through the meter, and is required once a supply exceeds the limit for direct connection. We build main switchboards with CT metering provisions on 200A and larger connections.

Can I get a separate electricity meter for a granny flat?

Yes, so the occupant pays for their own usage. We manage the switchboard work and the coordination with your retailer; send your details through the contact page.

Request a quote with the meter included.

1300 58 58 16 Get a quote