Fitouts, precincts, strata and supply upgrades, delivered on sites that stay open while we do it. The supply connection is handled in house, so the job does not sit in a queue.

Commercial work on sites that cannot stop
Offices, strata and mixed use buildings, public facilities, precincts and fitouts. Most of it happens while the place is still open, still trading and still full of people.
That constraint shapes everything: how the work is staged, when the power comes off, what stays running while it does, and who needs telling before it happens. We plan it that way from the quote rather than discovering it on site.
- Commercial fitouts and tenancy works
- Precinct power and lighting
- Strata and mixed use buildings
- Supply, main switchboard and metering upgrades
- Preventative maintenance and defect repairs

How we run an occupied site
01
Scope and drawings in. We price the electrical package including the supply and the approvals.
02
Staging planned around trading hours, access and whoever else is on site.
03
Outages taken in planned windows, with generators where the site cannot go dark.
04
Tested, energised, documented and handed over.
Nobody gets told the power is off on the morning it happens.
Proof, not a promise
We delivered the power and lighting upgrade across a live public heritage precinct on Sydney Harbour. The site stayed open the whole way through, and the historic vessels moored at the wharf stayed powered on a backup generator while the cabling underneath them was replaced. It included marine grade detailing and cathodic protection to the seawall.
On a multi tenancy commercial building we replaced the overhead mains from the network pole and installed a new 200A main switchboard, coordinated across every tenancy and delivered in one planned Saturday night shutdown under traffic control.
See the work on the electrical projects page.
The supply connection is not somebody else's problem
Commercial jobs stall at the supply. A new service, bigger consumer mains, a main switchboard, metering, and network approvals behind all of it, usually needing a second contractor and a queue.
Thorntek is a Level 2 ASP with both Ausgrid and Endeavour Energy across all four classes, so that whole layer is in house. One contractor, one program, and the approvals lodged by the people doing the work.
Got a scope or a set of drawings? Send them through the contact page and we will price the electrical package.
Common questions
Can you work on a site that has to stay open?
That is most of what we do on the commercial side. The work is staged so the parts of the site that have to keep trading stay on, with temporary supply where a section has to come off, and the shutdown windows agreed with you before anything starts.
How do you handle a shutdown across multiple tenancies?
One program, coordinated with every tenancy, executed in a single planned window. Each tenant gets told the date and the outage time in advance, and the changeover is sequenced so nobody is off longer than they were told.
Do you do after hours and weekend work?
Yes, and for occupied commercial sites it is usually the only sensible way. Night and weekend shutdowns get planned into the quote with the traffic control and access arranged, not sprung on you partway through.
Can you handle the supply connection as well?
Yes. We hold Level 2 ASP 4869 with both Ausgrid and Endeavour Energy across all four classes, so new services, consumer mains, metering and the network approvals are all done in house alongside the works.
What sort of commercial work do you take on?
Fitouts, strata and mixed use buildings, precinct works, public facilities, supply and switchboard upgrades, and ongoing maintenance. If it is commercial and it needs power, send us the scope.
Do you work for head contractors?
Regularly. We take the electrical package on council and head contractor jobs and run it to the program, including the network approvals that usually sit outside a normal electrical scope.